YEERS Renewable Energy - Humber Bridge Hull
Manufacturing Energy Solutions

Solar Power for
Factories & Manufacturing

High-output solar PV systems engineered for energy-intensive manufacturing operations across Hull and East Yorkshire.

MCS Accredited
PAS 2035 Certified
TrustMark Approved

500+

Installations

15MW

Capacity Installed

98%

Customer Satisfaction

10yr

Workmanship Warranty

Hull: The UK's Manufacturing Powerhouse

Hull and the Humber region is home to the UK's largest industrial cluster, emitting over 12 million tonnes of CO2 annually. For manufacturers operating energy-intensive production lines, compressors, and process heating, electricity represents a significant and rising overhead.

Commercial solar offers factories a strategic advantage: fixing electricity costs at approximately 4-5p per kWh for 25+ years while accessing immediate tax relief through 100% Annual Investment Allowance. With Hull's concentration of food manufacturing, chemicals, and advanced engineering, the opportunity is substantial.

24/7 Consumption

Factories with continuous production achieve 80-95% self-consumption rates, maximising the value of every kWh generated on-site.

3-5 Year Payback

Energy-intensive manufacturing operations typically see faster payback periods than any other commercial sector.

Peak Shaving

Combine solar with battery storage to reduce demand charges during peak production hours.

Net Zero Compliance

Meet supply chain sustainability requirements and Oh Yes! Net Zero commitments with verified carbon reductions.

Hull's Manufacturing Solar Opportunity

Hull's manufacturing base spans food processing, chemicals, pharmaceuticals, and advanced engineering. Key employers with significant solar potential include:

  • Food Manufacturing: Cranswick plc operates five factory sites in Hull. Aunt Bessie's runs three plants producing 20 million Yorkshire puddings per week. These facilities have large roof areas and constant energy demand for refrigeration, cooking, and packaging lines.
  • Chemicals & Pharmaceuticals: Saltend Chemicals Park hosts BP, INEOS Acetyls, and Mitsubishi Chemical UK across 370 acres. Reckitt has invested £105m in a Science & Innovation Centre on Dansom Lane.
  • Advanced Engineering: Smith & Nephew is building a £120m facility at Melton West. The Siemens Gamesa supply chain corridor along the Humber creates further demand.

The Humber Freeport designation provides Enhanced Capital Allowances and business rates relief for manufacturing businesses within its tax zones, making solar investment even more attractive.

Case Study: Food Processing Facility, Sutton Fields

A food processing client on Sutton Fields Industrial Estate with significant refrigeration loads and 24-hour production installed a 350kW rooftop system.

  • System Size: 350 kW
  • Annual Generation: 310,000 kWh
  • Self-Consumption: 92%
  • Annual Savings: £68,000
  • Payback Period: 3.2 years

£68k

Annual energy savings

3.2 yr

Payback period

Technical Considerations for Factories

Manufacturing environments present unique installation requirements that our commercial team is experienced in handling:

  • Structural Loading: Factory roofs vary from lightweight steel portal frames to reinforced concrete. We commission independent structural surveys to verify load capacity before any installation.
  • Grid Connection (G99): Systems over 50kW require formal grid connection applications to Northern Powergrid. We manage the entire G99 process, including export limitation if required.
  • Operational Continuity: Installation is scheduled around production cycles. Weekend and night-shift installation available to prevent downtime.
  • Fire Safety: Compliance with BS EN 62446 and coordination with your fire risk assessment for emergency access routes.

Explore Industrial Estates

Free Factory Assessment

Upload your half-hourly interval data or recent energy bill for a precise ROI calculation tailored to your production schedule.

From Consultation to Generation

We make switching to solar simple. Our end-to-end service handles everything from DNO applications to scaffolding, so you can focus on the savings.

1. Consultation

We analyze your energy bills and consumption to propose the optimal system size.

2. Survey & Design

A technical surveyor visits your property to ensure structural suitability and finalize designs.

3. Installation

Our MCS-certified team installs your system, typically within 1-2 days with minimal disruption.

4. Activation

We handle the DNO paperwork, set up your monitoring app, and hand over your power station.

YEERS Installation Team Fleet
Contact Us

Start Your Project Today

Ready to reduce operational costs or improve your home's rating? Fill out the form for a free, no-obligation survey. We operate throughout Yorkshire.

Call Us

01482 765 095

Mon-Fri: 9am - 6pm

Email Us

hello@yeers.co.uk

Visit HQ

Office 4, Blanket Row, Hull, HU1 1TB

By submitting this form, you agree to our Privacy Policy. We respect your data.