Hedon's Trusted Solar Installers

Solar Panels
Hedon & Holderness

Professional solar panel installations for Hedon homes and rural Holderness properties. Local expertise, quality installations.

MCS Certified
PAS 2035 Certified
TrustMark Registered

500+

Installations

15MW

Capacity Installed

98%

Customer Satisfaction

10yr

Workmanship Warranty

Solar Panels for Hedon & Holderness

Hedon is a historic market town east of Hull, at the gateway to Holderness — one of the flattest, most open landscapes in England. This geography is a genuine advantage for solar: minimal shading, excellent exposure to sunlight throughout the day, and strong annual irradiance make Hedon and surrounding Holderness villages particularly well-suited to solar panel installation.

The next practical step is a site survey — read more about solar panels for Hull homes.

YEERS serves both Hedon's residential properties and the wider Holderness farming and rural community. From Victorian terraces near St Augustine's Church to modern builds on Hedon's newer estates, and from farmhouses to agricultural outbuildings — we've installed solar across the full range of Holderness property types. Our rural installation experience includes managing Northern Powergrid connections for off-grid and rural locations.

Why Hedon & Holderness Suits Solar

Flat, Open Landscape

Minimal shading — excellent solar exposure all year

Above-Average Irradiance

860-910 kWh/kWp — eastern coastal benefit

Rural Installation Experts

Experience with farmhouses, barns, and off-grid properties

Conservation Area Knowledge

Hedon town centre planning expertise

Hedon Solar Performance

£600-£1,000
Annual Hedon Savings
8-11 Yrs
Average Payback Period
860-910
kWh per kW Annually

Hedon System Pricing

3-4kW System

Hedon town centre terraces and semis

£5,500-£8,000
Installed, 0% VAT

Generates 2,600-3,600 kWh annually. Covers 60-75% of typical household consumption.

6kW+ Rural System

Farmhouses and larger Holderness properties

£9,000-£14,000
Installed, 0% VAT

Larger systems for rural properties with higher energy consumption. Battery storage recommended for off-peak optimisation.

Holderness Agricultural Solar

Holderness farms can benefit significantly from commercial solar. Large barn roofs, high daytime energy use for drying and refrigeration, and Full Expensing tax relief make agricultural solar a strong investment.

Holderness Villages We Serve

Free Hedon Survey

Professional solar assessment for your Hedon or Holderness property. Free site survey and detailed quote.

Get Free Quote

About Hedon

  • Location
    6 miles east of Hull city centre
  • Character
    Historic market town, gateway to Holderness
  • Postcode
    HU12
  • Grid Operator
    Northern Powergrid

Why YEERS?

  • MCS certified, 25-year warranties
  • Rural installation experience
  • Conservation area planning expertise
  • 0% VAT on all residential systems

Solar Panels Hedon — FAQs

Advice on commercial savings, government grants, and renewable technology.

Do solar panels work well in Hedon?
Yes, solar panels work very well in Hedon. The town sits in the flat, open landscape of Holderness, east of Hull, with minimal shading from trees and neighbouring buildings — ideal conditions for solar generation. Hedon receives approximately 860-910 kWh per kW of installed capacity annually, slightly above the East Yorkshire average due to its eastern position and reduced cloud cover from the Humber estuary.
How much do solar panels cost in Hedon?
Solar panel installations in Hedon typically cost £5,500-£10,000 for residential systems. A 4kW system costs approximately £6,000-£8,000 with 0% VAT applied. Hedon's older terraced properties near the town centre may suit smaller 3-4kW systems, while detached homes on newer estates can accommodate 5-6kW systems. Most Hedon homeowners see an 8-11 year payback period.
Are there planning restrictions in Hedon?
Hedon has a significant conservation area covering much of the historic town centre, including areas around St Augustine's Church. Listed buildings and properties within the conservation area will need planning permission for solar panels. However, properties outside the conservation area are generally permitted development. YEERS assesses every Hedon property individually and manages all planning applications where required.
Can rural properties near Hedon get solar panels?
Yes — YEERS regularly installs solar panels on rural properties in Holderness surrounding Hedon, including Paull, Thorngumbald, Keyingham, and beyond. Rural properties often have excellent solar potential with large roofs and minimal shading. Agricultural buildings can also benefit from commercial solar installations. We assess rural grid connections and manage the Northern Powergrid notification process.

Hedon in the 2021 Census: who owns the roofs

The 2021 Census counted 6,878 usual residents and 3,122 households in Hedon parish. The tenure table, which totals 3,124 households, puts 2,318 in the owned or shared ownership group, 555 renting privately or living rent free, and 251 renting social housing. Tenure matters for the chargepoint grant for renters and flat owners: tenants of any home can apply, private or social, but people who own the house they live in cannot. For other funding, see our grants page.

Hedon's two conservation areas and the 2026 solar rules

Hedon was designated a conservation area in January 1969 by the former East Riding County Council, and East Riding of Yorkshire Council's 2006 appraisal says it was the first in Holderness. A separate Hedon Haven Conservation Area, designated by Holderness Borough Council in 1992, covers the Haven, the ancient port of Holderness, less than a mile south of the town centre.

Since 27 August 2026 (S.I. 2026/896), permitted development for solar on a house in a conservation area excludes panels on a wall, balcony or roof enclosure that fronts a highway. Pitched roof slopes are not named in that limitation. They follow the general limits: no more than 0.2 metres beyond the roof slope and no higher than the highest part of the roof, excluding any chimney. Work permitted under the old rules but not the new ones can still be carried out until the end of 26 August 2027. The appraisal notes that a high proportion of central Hedon buildings stand at the back of the pavement. On those streets, panels on the front wall fall outside permitted development, while the roof slope above can still qualify if the house is not listed or on a scheduled monument site.

Listed homes, St Augustine's and the scheduled monument

The appraisal says Hedon has more listed buildings than any other parish in Holderness, with listed addresses on Souttergate, St Augustine's Gate, Market Place, Market Hill, Magdalen Gate, Fletchergate, Baxtergate and George Street. Permitted development does not cover solar on a listed house or a building within its curtilage, so those homes need a planning application to East Riding of Yorkshire Council.

The Church of St Augustine on Church Lane is Grade I, first listed on 9 January 1954. Historic England records its crossing tower of 1428 and G E Street's restoration of 1868 to 1876, and the appraisal treats the church as the principal focal point of the area. Living near it does not by itself remove permitted development: the listed-building limitation applies where the house itself is listed.

The appraisal also records that a large part of the conservation area is scheduled as an ancient monument, the scheduled areas mainly reflecting the location of the watercourses. Permitted development does not cover solar on a scheduled monument site. The council's planning constraints map shows conservation areas, listed buildings and scheduled monuments, but the council says it acts as a guide only.

Salt End, the Humber and the local network

The appraisal describes Hedon as low lying and level, rising to more than 20 feet above sea level only on Market Hill, some two miles from the Humber estuary, with the Salt End cooling towers dominating the southern skyline. The council's adopted Allocations Document Update (2025) sets aside 179.42 hectares east of Salt End (site HAV-A, Hedon Haven) for Port of Hull expansion, behind the Humber flood defences and next to the Humber Estuary SPA, SAC, Ramsar site and SSSI. Those flood and habitat requirements attach to that allocation; none of the 2026 rooftop solar limitations for houses mentions flood zones.

Northern Powergrid runs the network for Hedon's HU12 postcodes. Its open data lists the Saltend 132/33kV bulk supply point at HU12 8EY among the substations serving HU12 postal sectors. Under the ENA's G98 standard, 16A per phase corresponds to 3.68 kW single-phase, and MCS says systems within that limit are notified within 28 days of being commissioned. If the total, battery included, exceeds 16A per phase, the G99 process applies before installation. See battery storage in Hull if you are adding storage, or solar panels in Hull. The appraisal places the Hedon Conservation Area in the 'Burstwick to Withernsea Farmland' landscape character area; our Withernsea page covers Withernsea itself.

Frequently asked questions

Do I need planning permission for solar panels in Hedon's conservation area?
Not always. Since 27 August 2026, permitted development in a conservation area excludes panels on a wall, balcony or roof enclosure fronting a highway, but pitched roof slopes are not named. Listed houses and scheduled monument sites fall outside permitted development, and East Riding of Yorkshire Council's appraisal records that a large part of Hedon's conservation area is scheduled. Check the council's planning constraints map, which the council says is a guide only.
My house in Hedon is listed. Can I still have solar panels?
Possibly, but not under permitted development. Hedon has more listed buildings than any other parish in Holderness, according to the council's appraisal. Solar on a listed house needs a planning application to East Riding of Yorkshire Council. Living near St Augustine's Church (Grade I) does not change the position for a house that is not listed.
Who is the electricity network operator for Hedon (HU12)?
Northern Powergrid, whose open data lists the Saltend 132/33kV bulk supply point at HU12 8EY among the substations serving HU12. Systems up to 16A per phase (3.68 kW single-phase) follow G98; above that, the G99 process applies before installation.
I rent my home in Hedon. Is there a grant I can use?
The 2021 Census recorded 555 Hedon households renting privately or living rent free, and 251 renting social housing. The chargepoint grant for renters and flat owners pays 75% of the cost of a socket, up to £500, if the home has private off-street parking and you own an eligible vehicle. People who own the house they live in are not eligible. It closes on 31 March 2027.

Updated September 2026.

Contact Us

Start Your Project Today

Ready to reduce operational costs or improve your home's rating? Fill out the form for a free, no-obligation survey. We operate throughout Yorkshire.

Call Us

01482 765 095

Mon-Fri: 9am - 6pm

Visit HQ

Office 4, Blanket Row, Hull, HU1 1TB

By submitting this form, you agree to our Privacy Policy. We respect your data.

Looking for the right page? solar panels Hull

Call Free Quote Callback